Case Studies
The Parks Project Phase 1
The Parks project in Edmonton uses Lafarge’s ECOPact low-carbon concrete and digital solutions like SMARTherm and ConcreteDirect, achieving early completion, $600K savings, and 252,600 kg emissions reduction in Phase 1.
The Eglinton LRT: How to Make a Big Impact with a Smaller Carbon Footprint
The Eglinton LRT project used high-volume SCM concrete to reduce emissions, manage heat during curing, and enhance durability, aiming for significant GHG reductions in Canada’s infrastructure projects.
CIBC Square at 81 Bay St, Toronto
Hines and Ivanhoé Cambridge, with EllisDon, are using EXACT’s technology to monitor temperature, concrete maturity, and formwork pressure on their project. This ensures the core reaches required strength and maintains safe loads. Urban Toronto shared a timelapse of the progress.
CNIB Tower (Edmonton, Alberta)
EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials.
All Case Studies
Learn how our leading-edge hardware and software solutions are helping construction companies around the world build the roads, bridges, tunnels, and buildings of the future.
The Parks Project Phase 1
The Parks project in Edmonton uses Lafarge’s ECOPact low-carbon concrete and digital solutions like SMARTherm and ConcreteDirect, achieving early completion, $600K savings, and 252,600 kg emissions reduction in Phase 1.
The Eglinton LRT: How to Make a Big Impact with a Smaller Carbon Footprint
The Eglinton LRT project used high-volume SCM concrete to reduce emissions, manage heat during curing, and enhance durability, aiming for significant GHG reductions in Canada’s infrastructure projects.
CIBC Square at 81 Bay St, Toronto
Hines and Ivanhoé Cambridge, with EllisDon, are using EXACT’s technology to monitor temperature, concrete maturity, and formwork pressure on their project. This ensures the core reaches required strength and maintains safe loads. Urban Toronto shared a timelapse of the progress.
CNIB Tower (Edmonton, Alberta)
EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials.
The Future of Exact Technology
A look into the future developments in Exact Technology and its potential impact.
Innovative Technology. Concrete Results.
Harness the power of real-time data at your fingertips, accelerate timelines, and get more precision in every pour.