Winter is Coming: How a Mass Timber Project Stayed Ahead of the Cold with Smart Climate Management

Client
Solutions Provided
ControlPro

THE PROJECT

Building Type Multistory mass timber building construction.

Status In progress

Rentals Stephenson’s Rental Services

Solution Stephenson's ControlPro

Exact Scope On-site climate control using 150 kW & 60 kW electric heaters, with targeted monitoring and control across floors at different stages of completion.

Project Objectives, Requirements & Challenges

Mass timber builds are highly sensitive to temperature changes, adhesives and engineered wood need to stay within strict ranges to avoid damage.

The key challenges were:

  • Material Sensitivity: Temperature-sensitive materials, such as specific adhesives and engineered wood, required consistent and reliable heating to prevent curing failures or damage.
  • Energy Management: The use of large 150kW and 60kW electric heaters posed a significant risk of energy overuse and waste if they were run at high setpoints around the clock.
  • Operational Inefficiency: Manual heater checks were time-consuming and labor-intensive, needing constant site visits from supervisors and staff.
    Complex Logistics: The project involved multiple floors in various stages of completion. This meant different floors had different heating needs, making centralized management difficult.
  • Winter Readiness: With winter approaching, there was a pressing need to have a reliable and responsive solution in place to keep the site protected and ready for ongoing work.

Meeting the Challenge 

ControlPro Solution

To address these challenges, the team deployed ControlPro, a remote thermostat management solution. This technology provided the critical tools needed for effective climate control on the complex project. The solution offered:

  • Remote Access and Control: Team members gained the ability to adjust heater set points in real-time from anywhere, directly based on current site conditions.
  • Proactive Monitoring and Alerts: The system provided alerts that notified staff immediately if temperatures dropped below safe thresholds or if a heater shut off unexpectedly.
  • Mobile Management: Site supervisors were able to manage and adjust heaters directly from their smartphones, significantly reducing the need for physical site visits and saving valuable time.
  • Energy Optimization: ControlPro enabled the team to set heaters to lower temperatures during off-hours or when full heat wasn’t necessary. This conserved energy without risking damage to the temperature-sensitive materials.
  • Remote Support: The solution allowed the team to monitor and support the project remotely, ensuring rapid response times to any issues that arose.

Project Outcomes

By the Numbers

While specific metrics are still being compiled, the project saw clear improvements across several key areas.

The implementation of the ControlPro solution led to several positive outcomes, directly addressing the project's core challenges:

  • Material Protection: The team successfully maintained optimal temperature ranges, protecting all materials and helping to meet construction quality standards.
  • Improved Response Times: The real-time alerts enabled staff to respond to issues with offline heaters or falling temperatures much faster than was possible with manual checks.
  • Reduced Energy Consumption: By actively adjusting set points and leveraging the energy-saving features of the system, the project was able to cut energy use.
  • Increased Efficiency & Peace of Mind: The need for manual heater checks and on-site visits was significantly reduced, saving labor hours and giving the entire team greater peace of mind.
  • Enhanced Project Viability: ControlPro showed that remote management can make electric heaters a highly practical and effective solution for mass timber and other temperature-sensitive builds. This success led to Stephenson’s being awarded additional ControlPro/heat work on the project for the upcoming winter.

What’s Next?

The success of the ControlPro solution on this project has made it a go-to tool for managing complex climate control needs. The project team is excited to expand the use of the technology and plans to add more units for the upcoming winter season. By continuing to leverage the system's ability to optimize energy use and provide real-time monitoring, they expect to achieve new levels of efficiency and cost savings, ensuring the project stays on schedule and on budget, even as temperatures drop.

Contact Us

Learn how Stephenson’s ControlPro can help protect your project this winter while reducing costs and increasing efficiency.

Challenge

Solution

Results

All Case Studies

Learn how our leading-edge hardware and software solutions are helping construction companies around the world build the roads, bridges, tunnels, and buildings of the future.

Text Link

Winter is Coming: How a Mass Timber Project Stayed Ahead of the Cold with Smart Climate Management

Client
Solutions Provided
ControlPro

Stephenson's ControlPro provided a mass timber construction project with a remote climate management solution, ensuring the integrity of sensitive materials and eliminating the need for manual heater checks. This resulted in improved operational efficiency, reduced energy consumption, and peace of mind for the project team.

Read More
Text Link

Toronto's Sky-High Savings: How Alterra Slashed Costs and Minimized Delays using EXACT Concrete Monitoring

Client
Alterra
Solutions Provided
Monitor

Alterra, a leading developer in Toronto, utilized our EXACT monitoring to overcome the challenges of building a 39-floor high-rise condominium, resulting in over $6,000 in direct savings and tens of thousands in additional saving by preventing overtime and streamlining subcontractor schedules. Their success with the technology has led them to plan the expanded use of our equipment for upcoming projects.

Read More
Text Link

Heat, Speed and Strength: Electrifying Finfrock’s Precast Curing Process

Client
FinFrock
Solutions Provided
Cure

This project highlights EXACT’s successful electric curing system retrofit for Finfrock in Florida. The team delivered a large-scale electric heater installation on two pre-existing double tee beds, enhancing efficiency, modernizing infrastructure, and strengthening a long-standing client relationship.

Read More
Text Link

The Parks Project Phase 1

Client
Ledcor
Solutions Provided

The Parks project in Edmonton uses Lafarge’s ECOPact low-carbon concrete and digital solutions like SMARTherm and ConcreteDirect, achieving early completion, $600K savings, and 252,600 kg emissions reduction in Phase 1.

Read More
Text Link

The Eglinton LRT: How to Make a Big Impact with a Smaller Carbon Footprint

Client
Metrolinx
Solutions Provided

The Eglinton LRT project used high-volume SCM concrete to reduce emissions, manage heat during curing, and enhance durability, aiming for significant GHG reductions in Canada’s infrastructure projects.

Read More
Text Link

CIBC Square at 81 Bay St, Toronto

Client
EllisDon
Solutions Provided

Hines and Ivanhoé Cambridge, with EllisDon, are using EXACT’s technology to monitor temperature, concrete maturity, and formwork pressure on their project. This ensures the core reaches required strength and maintains safe loads. Urban Toronto shared a timelapse of the progress.

Read More
Text Link

CNIB Tower (Edmonton, Alberta)

Client
EllisDon
Solutions Provided

EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials.

Read More
Text Link

Challenges in Adopting Exact Technology

Client
Lafarge
Solutions Provided

An exploration of the challenges organizations face when implementing Exact Technology.

Read More
Text Link

Exact Technology in Healthcare

Client
Lafarge
Solutions Provided

An overview of how Exact Technology is transforming the healthcare industry.

Read More

Innovative Technology. Concrete Results.

Harness the power of real-time data at your fingertips, accelerate timelines, and get more precision in every pour.