High-Rise / Institutional
Rising to Every Challenge
From crane bases and foundations to elevator shafts and floor plates, EXACT gives you the tools needed to accelerate cycles, and ensure quality.
Would it be a game changer to know the moment your concrete hits strength for scheduling form removal and mitigating/limiting deflection?
Have you lost valuable time waiting for lab results that didn’t reflect actual site conditions?
Do you use overdesigned mixes “just to be sure?”
What if a heater fails overnight and you don't know until morning?
We model in-place concrete strength in real-time as the pour cures, giving you the ability to proactively manage the curing process. This enables data-driven decisions that lead to earlier form stripping with reduced deflection, crack mitigation, and on-schedule project delivery.
Cast-in-Place
High-rise/Institutional
Monitor every pour. Match cylinders to reality. Control heaters remotely. Track results from start to finish. Discover EXACT’s connected solutions — xMonitor, xMatch, xControl, and xTrack.
xMatch on site
Match cure cylinders for early age results and maturity verification.
xMonitor in core walls
Temperature and strength for early age form stripping.
xMonitor for interiors
Monitor temperature and relative humidity of ambient conditions.
xMonitor in foundations
Monitor temperture in mass concrete to comply with maximum temperture and differentials.
xControl on heaters
Monitor and control heaters remotely.
xTrack on mobile device
Perform digital quality control inspections.
EXACT helps General Contractors deliver concrete confidence, whether you’re placing concrete for high-rise buildings or large-scale institutional projects. EXACT provides the tools to manage thermal risk and optimize your schedule.
Top Reasons General Contractors Choose EXACT.
Featured Projects

Toronto’s Sky-High Savings: How Alterra Slashed Costs and Minimized Delays using EXACT Concrete Monitoring
The primary objective of this project was to precisely track concrete strength gain and internal temperatures, ensuring concrete reached specified maturity targets for timely formwork stripping and subsequent construction activities.

CNIB Tower
EXACT Technology provided essential concrete temperature monitoring for the raft slab pour of the CNIB Tower project. Our solutions were deployed in multiple locations to deliver comprehensive data throughout the curing process
