Website Preloader

High-Rise Commercial

Build Faster.
Pour Smarter.
Strip Sooner.

Rising to Every Challenge

From concrete cores and elevator shafts to floor plates and podium decks, EXACT gives high-rise teams the real-time visibility and curing control needed to accelerate cycles, maintain quality, and meet demanding schedules.

What if a heater fails overnight and you don't know until morning?

Have you lost valuable time waiting for lab results that didn’t reflect actual site conditions?

Wouldn’t it be a game changer to know the moment your concrete hits strength for scheduling form removal and mitigating/limiting deflection?

Do you use overdesigned mixes “just to be sure?”

By continuing to rely on cylinder breaks or passive field sensors, you’re operating with limited and delayed insights. Our EXACT Monitor and Match Cure Systems provide a more advanced solution.

We model in-place concrete strength in real-time as the pour cures, giving you the ability to proactively manage the curing process. This enables data-driven decisions that lead to earlier form stripping with reduced deflection, crack mitigation, and on-schedule project delivery.

Our technology moves beyond simple data logging, providing the functionality to actively control the curing process. For high-stakes pours, confidence in the mix is critical, and our systems are engineered to provide it. 

 

Cast-in-Place
High-rise/Commercial

The EXACT System

Monitor every pour. Match cylinders to reality. Control curing with precision. Track results from start to finish. Discover EXACT’s connected solutions — xMonitor, xMatch, xControl, and xTrack.

View product details »

xMatch with concrete testing equipment

Match cure cylinders for early age results and maturity verification

xMonitor in core walls

Temperature and strength for early age form stripping

xMonitor in rooms

Monitor temperature and relative humidity of on-site ambient conditions

xMonitor in foundations

Monitor temperture in mass concrete to comply with maximum temperture and differentials

xControl on heaters

Monitor and control heaters remotely

xTrack on mobile device

Perform digital quality control inspections

EXACT helps General Contractors deliver concrete confidence in even the most demanding projects, whether you’re placing concrete for high-rise buildings or large-scale infrastructure projects.  EXACT provides the intelligence, control, and reliability to manage thermal risk, reduce delays, and optimize your schedule.

Top Reasons General Contractors Choose EXACT.

Thermal Risk Control: Real-time monitoring and adaptive curing reduce the risk of thermal cracking.

Schedule Assurance: Faster strength gain means you can often strip forms earlier and optimize your construction schedule

Inspector Confidence: Meet or exceed spec expectations with documented thermal profiles and curing history.

Less Overdesign: Reduce the need for costly overdesign by curing with precision, based on actual in-place conditions.

Lower Project Carbon Footprint: Have confidence in using sustainable mixes

Simple to Deploy: Robust, easy-to-use field-ready kits and intuitive software mean crews get up and running quickly

Real-time Data at Your Fingertips: Never go to sleep wondering what the results will reveal in the morning. Data is constantly uploaded, in real-time to be viewed on your phone or tablet.

Proven Performance: Used on infrastructure, towers, and mat slabs where failure isn’t an option.

More Than Monitoring: EXACT offers intelligent control — not just data collection — to actively shape curing outcomes.

Engineer-Led Support: From profile planning to troubleshooting, EXACT backs every project with expert guidance.

Featured Projects

Toronto’s Sky-High Savings: How Alterra Slashed Costs and Minimized Delays using EXACT Concrete Monitoring

Toronto’s Sky-High Savings: How Alterra Slashed Costs and Minimized Delays using EXACT Concrete Monitoring

The primary objective of this project was to precisely track concrete strength gain and internal temperatures, ensuring concrete reached specified maturity targets for timely formwork stripping and subsequent construction activities.

CNIB Tower

CNIB Tower

The EXACT electric curing system will improve production output and consistency at Finfrock, helping them stay competitive while maximizing the use of their existing forms.

No results found.

Let's Connect

From high-rise to infrastructure-scale pours, EXACT provides the intelligence, control, and reliability to manage thermal risk, reduce delays, and optimize your schedule.

View our Product Solutions »

Driven by a commitment to helping our clients succeed, we take pride in building a legacy of innovation and excellence that will stand the test of time.

High-Rise Commercial

  • Strip earlier
  • Avoid rework
  • Meet scheduled targets

Infrastructure

  • Control mass temperatures
  • Meet DOT specs
  • Verify Results

Precast Concrete

  • Turn beds faster
  • Reduce waste
  • Control energy

Testing Labs

  • Push the limits of your mix designs
  • Replicate real-world scenarios in a controlled environment

Partners

  • DOTs & inspectors
  • Design teams
  • Strategic partners

Cast-in-Place Solutions

From high-rises to infrastructure, EXACT combines monitoring, match-curing, curing control, and digital tracking to help contractors pour smarter, strip sooner, and deliver stronger, more reliable structures with confidence.

xMonitor / xMatch / xControl / xTrack

Precast / Prestress Solutions

EXACT’s integrated monitoring, control, curing, and digital tracking solutions give precast producers end-to-end visibility that accelerates cycles, reduces costs, and improves quality.

xMonitor / xMatch / xControl / xTrack

Concrete Testing Solutions

EXACT’s monitoring and match-curing solutions give labs accurate, trusted results with streamlined workflows and digital records that reduce delays, cut manual effort, and strengthen client confidence.

xMonitor / xMatch / xTrack