Website Preloader
CNIB Tower

CNIB Tower

EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials. June 3, 2021 We’ve helped the team...

High-Rise Commercial

  • Strip earlier
  • Avoid rework
  • Meet scheduled targets

Infrastructure

  • Control mass temperatures
  • Meet DOT specs
  • Verify Results

Precast Concrete

  • Turn beds faster
  • Reduce waste
  • Control energy

Testing Labs

  • Push the limits of your mix designs
  • Replicate real-world scenarios in a controlled environment

Partners

  • DOTs & inspectors
  • Design teams
  • Strategic partners

Cast-in-Place Solutions

From high-rises to infrastructure, EXACT combines monitoring, match-curing, curing control, and digital tracking to help contractors pour smarter, strip sooner, and deliver stronger, more reliable structures with confidence.

xMonitor / xMatch / xControl / xTrack

Precast / Prestress Solutions

EXACT’s integrated monitoring, control, curing, and digital tracking solutions give precast producers end-to-end visibility that accelerates cycles, reduces costs, and improves quality.

xMonitor / xMatch / xControl / xTrack

Concrete Testing Solutions

EXACT’s monitoring and match-curing solutions give labs accurate, trusted results with streamlined workflows and digital records that reduce delays, cut manual effort, and strengthen client confidence.

xMonitor / xMatch / xTrack