Case Studies
Learn how our leading-edge hardware and software solutions are helping construction companies around the world build the roads, bridges, tunnels, and buildings of the future.

"EXACT's match curing is really the gold standard." - WJE Labs experts confirm. Our new case study reveals how Wiss, Janney, Elstner Associates, Inc. is using the EXACT Match system to achieve unparalleled precision in concrete strength determination. This move ensures schedule acceleration and provides the verified data needed to successfully deploy high-performance, low-embodied carbon mixtures.

Concrete temperature monitoring for the William Halton Parkway segmental bridge in Oakville, ON. See how EXACT Flex Loggers ensured construction quality control and structural integrity across 11,600 m³ of mass concrete in this critical infrastructure project.

Stubbe's Precast, a leading name in the precast concrete industry, is transforming their operations, moving from traditional, manual processes with a mix of digital entry platforms to a fully integrated digital platform powered by EXACT Track. This case study explores how our collaborative approach is helping Stubbe's unlock efficiency, accuracy, and real-time insights across their plants.

Stephenson's ControlPro provided a mass timber construction project with a remote climate management solution, ensuring the integrity of sensitive materials and eliminating the need for manual heater checks. This resulted in improved operational efficiency, reduced energy consumption, and peace of mind for the project team.

The Parks project in Edmonton uses Lafarge’s ECOPact low-carbon concrete and digital solutions like SMARTherm and ConcreteDirect, achieving early completion, $600K savings, and 252,600 kg emissions reduction in Phase 1.

The Eglinton LRT project used high-volume SCM concrete to reduce emissions, manage heat during curing, and enhance durability, aiming for significant GHG reductions in Canada’s infrastructure projects.

This project highlights EXACT’s successful electric curing system retrofit for Finfrock in Florida. The team delivered a large-scale electric heater installation on two pre-existing double tee beds, enhancing efficiency, modernizing infrastructure, and strengthening a long-standing client relationship.

EXACT Technology provided essential concrete temperature monitoring for the raft slab pour of the CNIB Tower project. Our solutions were deployed in multiple locations to deliver comprehensive data throughout the curing process

The primary objective of this project was to precisely track concrete strength gain and internal temperatures, ensuring concrete reached specified maturity targets for timely formwork stripping and subsequent construction activities.
Eliminate Assumptions. Empower Decisions.
Harness the power of real-time data, accelerate timelines, and pour with total confidence.
