by 2M Creative | Sep 28, 2025
The Parks project, a high-rise residential/mixed-use development, features two high-rise towers and is being constructed in two phases. Phase 1 includes the construction of the first tower, which will have 37 floors and 5 levels of underground parkade space for 363...
by 2M Creative | Sep 28, 2025
The Eglinton Crosstown Light Rail Transit (ECLRT) is part of Metrolinx’s regional transportation plan, The Big Move, and is one of the first large-scale transit projects for the Toronto, ON, Canada area. ECLRT will provide fast, dependable, and comfortable transit...
by 2M Creative | Sep 28, 2025
EXACT Technology Corporation monitored the concrete temperature in several locations of this raft slab pour to help the project team proactively meet the mass concrete requirements for maximum temperature and allowable differentials. June 3, 2021 We’ve helped the team...
by 2M Creative | Sep 28, 2025
EXACT SCOPE: Strength and temperature monitoring for critical cast-in-place concrete elements across all 39 floors to optimize formwork cycling, accelerate construction timelines, and ensure adherence to the ambitious project schedule. Highlights: Toronto’s 125 George...