Website Preloader
CIBC Square

CIBC Square

81 Bay, a monumental, forty-nine storey, office and retail development in downtown Toronto was built leveraging EXACT’s state-of-the-art temperature, strength and formwork monitoring technology. The project had very demanding requirements in terms of concrete design....
The Parks Project Phase 1

The Parks Project Phase 1

The Parks project, a high-rise residential/mixed-use development, features two high-rise towers and is being constructed in two phases. Phase 1 includes the construction of the first tower, which will have 37 floors and 5 levels of underground parkade space for 363...

Infrastructure

  • Monitor Mass Concrete
  • Meet DOT Specs
  • Verify Results

Precast / Prestressed

  • Turn Beds Faster
  • Optimize Labor
  • Digitize Production and QC

High-Rise / Institutional

  • Strip Earlier
  • Avoid Rework
  • Meet Scheduled Targets

Testing Labs

  • Differentiate Your Business
  • Automate Reporting
  • Land More Projects

Partners

  • DOTs & Inspectors
  • Engineering Consultants
  • Strategic Partners

Cast-in-Place Solutions

From infrastructure to high-rise, EXACT combines monitoring, match-curing, and digital tracking to help contractors pour smarter, strip sooner, and deliver stronger, more reliable structures with confidence.

Precast / Prestressed Solutions

EXACT’s integrated monitoring, match curing, control and digital tracking solutions give precast/prestressed producers end-to-end visibility that accelerates cycles, reduces costs, and improves quality.

Concrete Testing Solutions

EXACT’s monitoring and match-curing solutions give labs accurate, trusted results with streamlined workflows and digital records that reduce delays, cut manual effort, and strengthen client confidence.